毗连海岸岩礁深孔爆破设计与施工技术 被引量:1

The design and construction technology of deep-hole blasting of the adjacent coastal reefs
下载PDF
导出
摘要 为了解决毗连海岸岩礁深孔爆破因地形变化大、水深较浅,施工船舶难以进入,且受潮汐影响大,候潮作业施工效率低的问题,采用一种新的处理毗连海岸岩礁爆破施工方法,即利用简易围堰—填沙成陆的方式将近岸岩礁填筑成陆地,将水下爆破转为露天深孔爆破。在创造的陆地施工工作面上进行钻孔、插管、装药、爆破,取得了良好的爆破效果,爆堆整体隆起,最高达3 m,爆区前排紧邻围堰侧往前推出约4~5 m,后排紧邻山体侧往前推出约1~2 m。运用这种先成陆后实施岩礁深孔爆破的方法,规避了风、浪、潮汐、水流、水深等因素对施工的影响,极大地减少了安全隐患,同时利用陆地大型设备的优势,也提高了施工效率、降低了施工成本。 In order to solve the problem of deep-hole blasting of adjacent coastal reefs, which is difficult for construction vessels to enter due to the great change of topography and shallow water depth, and is greatly affected by the tide, and the construction efficiency of tidal operation is low, a new blasting construction method for adjacent coastal reefs is adopted, that is, using simple cofferdam-sand filling to land the adjacent coastal reefs, and converting underwater blasting into open-pit deep-hole blasting.Drilling, intubation, charging and blasting were carried out on the land construction working face created, and good blasting effect was achieved. The overall uplift of the blasting pile was up to 3 m. The front row of the blasting area was pushed forward about 4-5 m next to the cofferdam side, and the back row was pushed forward about 1-2 m next to the mountain side.This method of blasting deep holes in rocks after land formation avoids the influence of wind, wave, tide, water flow, water depth and other factors on the construction, which greatly reduces the potential safety hazards. At the same time, the advantage of large land equipment is utilized to improve the construction efficiency and reduce the construction cost.
作者 王林桂 丁银贵 张中雷 孙钰杰 廖敏敏 WANG Lin-gui;DING Yin-gui;ZHANG Zhong-lei;SUN Yu-jie;LIAO Min-min(Darch Construction Group Co.,Ltd.,Zhoushan 316000,Zhejiang,China;The United Academician Workstation ofDarch Constrction Group Co.,Ltd. and Zhejiang Ocean University,Zhoushan 316021,Zhejiang,China)
出处 《工程爆破》 CSCD 2019年第2期31-37,共7页 Engineering Blasting
关键词 毗连海岸 岩礁 深孔爆破 设计与施工 adjacent coastal the reefs deep-hole blasting design and construction
  • 相关文献

参考文献1

二级参考文献3

共引文献4

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部