基于SNA视角的PPP项目合同提前终止风险 被引量:13

Risk on Early Contract Termination of PPP Project Based on SNA Perspective
下载PDF
导出
摘要 PPP模式已越来越多地被基础设施与公共服务领域采用。然而实践中,有大量的PPP项目被提前终止,公私合作模式依旧存在诸多问题。首先从三个层面识别出PPP项目合同提前终止的风险因素,并基于问卷调查与一致性分析判断风险因素间相互关系,构建出风险关系邻接矩阵。其次利用社会网络分析方法中整体网的块模型分析与个体网的"中心性"分析,获得风险网络中的核心风险因素,并利用线的中间中心度确定网络中关键风险关系。最后结合风险因素间相互影响关系,针对核心风险因素与风险关系给出了相应的控制措施。政府与私人部门应加强自身风险行为管理,及时切断风险事件的传播,重点关注与项目特征有关的风险因素以及外部环境变动,从而减少合同提前终止的发生。 The PPP model has been increasingly adopted by infrastructure and public services. However , many PPP projects have been terminated early, and there are still many problems about PPP model. Firstly, the risk factors of early contract termination of PPP projects were identified from three levels. Questionnaire survey and consistency analysis were used to identify the relationship between risk factors, and the risk relationship adjacency matrix was constructed. Secondly, the core risk factors were obtained by the block model analysis of the whole network and the “centrality” analysis of the individual network in the social network analysis, and the key risk relationship was determined by the line centrality. Finally, combined with the relationship between risk factors, control measures were given for the core risk factors and risk relationships. The government and the private sector should strengthen their risk behavior management, cut off the spread of risk events timely, and pay attention to risk factors related to project characteristics and external environmental changes, thereby reducing the occurrence of early termination of contracts.
作者 刘华 李文娟 LIU Hua;LI Wen-juan(School of Management, Xi’an University of Architecture and Technology, Xi’an 710055, China)
出处 《土木工程与管理学报》 北大核心 2019年第2期35-41,共7页 Journal of Civil Engineering and Management
基金 陕西省社会科学基金(2017F006)
关键词 PPP项目 合同提前终止 风险 社会网络分析 PPP project early termination of contract risk social network analysis
  • 相关文献

参考文献4

二级参考文献26

  • 1王秀芹,梁学光,毛伟才.公私伙伴关系PPP模式成功的关键因素分析[J].国际经济合作,2007(12):59-62. 被引量:51
  • 2关于推广运用政府和社会资本合作模式有关问题的通知[DB/OL].财金[2014]76号,中华人民共和国财政.http://www.mof.gov.crdpub/jinron-gsi/zhengwuxinxi/zhengeefabu/201409/t20140924-1143760.html.
  • 3The Word Bank Infrastructure Policy Unit2012 PPI Data Update[DB/OL]. Transport Sector September.20 13.http://ppi.worldbank.orglfeatures/December-20131Transport-Note-2013.pdf.
  • 4Mohsin Ali Soomro and Xueqing Zhang. Failure Links between Public and Private Sector Partners in Transportation Public Private Partnerships Failures[J].Ioumal of Traffic and Logistics Engineering, 2013,1(2): 116-121.
  • 5Akintoye, A., Taylor, C., Fitzgerald, E. Risk analysis and management of private finance initiative projects[J].Engineering Construction and Architectural Management, 1998,5(1):9-21.
  • 6Ho, S.P. Model for financial renegotiation in Public-Private Partnership projects and its policy implications: game theoretic view[J].Joumal of Construction Engineering and Management, 2006,132(7): 678-688.
  • 7YinRK.案例研究:设计与方法[M].重庆大学出版社,2010.
  • 8杨继斌.高速华山服务区接管风波[NB/OL].新京报,2008.10.07.http://www.thebeijingnews.com.
  • 9Carolina Monsalve. Private participation in transport: Lessons from recent experience in Europe and Central Asia[J].World Bank Gridlns PublicPrivate Infrastructure Advisory Facility, 2009(47): 1-4.
  • 10Huster.L A Retrospective on the Mexican Toll Program(1989-94)[J].Public Policy for Pirvate Sector,NOR5, 1997.

共引文献87

同被引文献117

引证文献13

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部