摘要 介绍了中压外缸上部铸件的结构及技术要求,详细阐述了该铸件的生产工艺:(1)产品整体放在上箱,下箱无产品结构,主要放置浇注系统和芯头定位;(2)采用开放式浇注系统,从法兰底面进铁液;(3)在最后凝固的部位放置冒口,使铸件趋于顺序凝固;(4)采用Si-Mg合金和重RE球化剂,球化剂上覆盖Si-Ba孕育剂,出铁3/4时随流加入Si-Ba孕育剂,浇注时随铁液添加Si-Ba孕育剂进行二次孕育;(5)铁液过热温度1 500~1 510℃,出铁温度控制在1 440~1 450℃,浇注温度1 320~1 330℃,浇注时间120 s。生产结果显示:铸件尺寸、NDT及力学性能检验结果均合格。 The structure and technical requirements of the upper casting of the medium-pressure outer cylinder were introduced. The production process of the casting was described in detail:(1)The whole product was placed in the upper box in the lower part,casting system and the core head were mainly placed,instead of the product structure.(2)Using an open casting system to feed molten iron from the bottom surface of the flange.(3)Placing a rwaser at the final solidified portion to solidify the casting.(4)Using Si-Mg alloy and heavy RE spheroidizing agent. The spheroidizing agent was coated with the Si-Ba inoculant,and the Si-Ba inoculant was added with the flow of the iron at the 3/4 tap. The Si-Ba inoculant was added with the iron solution for the post incubation.(5)The superheat temperature of the molten iron was 1 500~1 510 ℃,the tapping temperature was controlled at 1 440~1 450 ℃,the pouring temperature was 1 320~1 330 ℃,and the pouring time was 120 s. The production results showed that the casting size,NDT and mechanical properties test results were all qualified.
作者 陈思明 苏少静 CHEN Si-ming;SU Shao-jing(Kocel Machinery Co.,Ltd.,Yinchuan 750021,China)
出处 《现代铸铁》 CAS 2019年第2期5-9,共5页 Modern Cast Iron
关键词 球墨铸铁 汽轮机 中压外缸 高Si-Mo nodular iron steam turbine medium pressure outer cylinder high Si-Mo
  • 相关文献

参考文献4

二级参考文献27

共引文献56

同被引文献25

引证文献11

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部