工程施工项目管理与案例分析——以项目变更索赔管理为方向 被引量:4

Project Management and Case Analysis of Engineering Construction:In the Direction of Project Change Claim Management
下载PDF
导出
摘要 就施工企业而言,变更是指修正设计图纸中的错误、漏项、增减工程以及为优化设计、方便施工发生的变更,索赔是指在合同实施过程中,因非自身原因造成的工程延期、费用增加而要求业主给予补偿损失的权利要求。变更索赔工作是项目管理的重要内容,本文以案例形式从"技术入手,经济结束"、"方案决定成本、成本约束方案"阐明施工企业项目部在项目管理变更索赔工作的六个要点。 As far as construction enterprises are concerned, alteration refers to the modification of errors, omissions, increments and decreases in design drawings, as well as the alterations to optimize design and facilitate construction. Claim refers to the owner’s right to compensate for losses caused by delays and increases in costs caused by non-self-reasons during the implementation of the contract.Change claim work is an important part of project management. In this paper, six key points of project management change claim work of construction enterprise project department are expounded in the form of case from "technology start, economy end","scheme decides cost,cost restraint scheme".
作者 岳蕾 YUE Lei(The 3rd Engineering Co.,Ltd. of China Railway 17 Bureau Group Corporation,Shijiazhuang 050081,China)
出处 《价值工程》 2019年第12期49-52,共4页 Value Engineering
关键词 施工企业 变更索赔 效益 construction enterprise change claim benefit
  • 相关文献

参考文献6

二级参考文献10

共引文献13

同被引文献13

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部