摘要 在地质勘察中,钻孔内取土后,野外初步鉴别新近沉积土,但当土层特征不明显的情况下,很难确认是否为新近沉积土层。可依据土的压缩模量和标准贯入试验值,建立的判别公式进行辅助判别。文章结合新机场北线高速公路工程实例,利用上述判别公式,对该工程拟建场地内新近沉积土进行了判定,采用该法可以更准确的鉴别新近沉积土。 In geological survey, after drilling the soil, the field initially identified the newly deposited soil, but when the characteristics of the soil layer is not obvious, it is difficult to confirm whether it is a newly deposited soil layer. Based on the compression modulus of soil and the standard penetration test value, the established discriminant formula can be used to assist the discriminant. Based on the example of the highway project on the North line of the new airport, this paper makes a judgment on the newly deposited soil in the proposed site of the project by using the above discrimination formula.
作者 高晓辉 GAO Xiao-hui(CRCC North China Investment Development Co.,Ltd.,Shijiazhuang 050000,China)
出处 《价值工程》 2019年第12期105-107,共3页 Value Engineering
关键词 新近沉积 压缩模量 标准贯入试验值 新机场北线 recent deposition compression modulus standard entry test value New Airport North Line
  • 相关文献

参考文献8

二级参考文献29

共引文献23

同被引文献23

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部