摘要
新建孟洲坝枢纽二线船闸工程具有地质条件复杂、工期短、任务重等特点,本文通过对工程重点、难点分析,提出应对措施,高质量的完成工程任务,同时也为同类工程提供参考依据。
The second line ship-lock project of the newly built Menzhouba Dam Hub has the characteristics of complicated geological conditions, short construction period and heavy task, this paper puts forward the countermeasures and high quality completion of the engineering task through the analysis of the key points and difficulties of the project. At the same time, it also provides reference for similar projects.
作者
陈云霞
Chen Yunxia(Guangdong Hydro-electricity Co., Ltd., Guangzhou, Guangdong 510340)
出处
《江西建材》
2019年第4期114-115,共2页
Jiangxi Building Materials
关键词
孟洲坝
施工
重点
难点
Mengzhouba
Construction
Key points
Difficulties