摘要 以南京至高淳城际快速轨道南京南站至禄口机场站工程TA01—1标禄口机场站-1号盾构井段为例,采取了穿越前技术措施、获取试验段施工掘进参数、下穿段施工控制以及全天候施工监测措施,取得了较好的效果,形成了一套盾构穿越机场滑行道的施工技术。 Herein the Section TA01-1 from Lukou Airport Station to Shield Shaft 1 was taken as an example, which was included in the works from South Nanjing Station to Lukou Airport Station of Nanjing-Gaochun Intercity Rapid Mass Transit. There the pre-crossing technical measures were used, the tunneling parameters obtained from the construction in test section, as well as the construction control and all-weather monitoring made in undercrossing section, all of which got good effect, hence a set of construction technology for shield undercrossing airport taxiway was thereby developed.
作者 陈强 CHEN Qiang(Chengtong Branch of China Railway No.2 Engineering Group Co.,Ltd.,Chengdu 610083, China)
出处 《路基工程》 2019年第2期175-178,共4页 Subgrade Engineering
关键词 盾构隧道 软硬不均地层 下穿机场滑行道 施工措施 掘进参数 shield tunnel soft-hard uneven strata undercrossing airport taxiway construction measures tunneling parameter
  • 相关文献

参考文献4

二级参考文献20

共引文献164

同被引文献37

引证文献5

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部