摘要
本文针对智能电能表全性能试验过程复杂、试验进程长的问题,基于模糊项目调度数学模型研究并设计了一种智能电能表全性能试验多任务并行优化策略。通过该策略使全性能试验设备人员资源最优化配置,实现了整批检验任务效率的最大化。
In this paper,based on the fuzzy test scheduling mathematical model,a multi-task parallel optimization strategy for smart energy meter full-performance test is studied and designed based on the complex test process and long test process of intelligent electric energy meter.Through this strategy,the full performance test equipment personnel resources are optimally configured,and the efficiency of the entire batch inspection task is maximized.
作者
范继臣
马晓奇
赵宇东
孙天雨
李永臣
Fan Jichen;Ma Xiaoqi;Zhao Yudong;Sun Tianyu;Li Yongchen(Electric Power of State Grid Liaoning Electric Power Co.,Ltd.,Shenyang,110006;Electric Power Research Institute of State Grid Liaoning Electric Power Co.,Ltd.,Shenyang,110006)
出处
《数字通信世界》
2019年第4期20-20,55,共2页
Digital Communication World
关键词
全性能试验
任务并行
优化策略
Full performance test
task parallelism
optimization strategy