摘要
南水北调中线工程丹江口大坝加高工程完成后,在蓄水过程中发现在初期工程范围内溢流坝段边墩横缝处理较大流量渗漏。采用了钻孔录像、压水检测、注水试验、水下摄像和声波CT等手段,实施了渗漏缺陷综合检查,发现横缝铜止水周边混凝土层间缝缺陷及上下游铜止水破损,并确定了渗漏通道及其高程,提出了横缝渗漏处理方案。
After the heightening project of Danjiangkou dam in the middle route of South-to-north water transfer project, it was found that large flow leakage occurred in the lateral pier joints of the overflow dam section in the initial stage of the project. Borehole photography, water injection test, underwater photography and acoustic chromatography(CT)were used to carry out a comprehensive inspection of the leakage defects. The defects of the concrete interlayer joints around the cross seam copper water stop and the water stop damage defects of the upstream and downstream copper were found, the leakage passage and its elevation were determined, and the treatment scheme of the cross seam leakage was put forward.
作者
王立
胡雨新
肖承京
甘孝清
邱本胜
Wang Li;Hu Yuxin;Xiao Chengjing;Gan Xiaoqing;Qiu Bensheng(South-to-North Water Transfer Middle Route Water Source Co., Ltd., Danjiangkou,Hubei 442700,China;Changjiang River Scientific Research Institute, Wuhan, Hubei 430010, China;National Dam Safety Research Center, Wuhan, Hubei 430010, China;Wuhan Changjiang Kechuang Science and Technology Development Co., Ltd., Wuhan, Hubei 430010, China)
出处
《中国建筑防水》
2019年第4期46-49,52,共5页
China Building Waterproofing
基金
国家自然科学基金(51709018
51609021)
中央级公益性科研院所基本科研业务费项目(CKSF2017039/CL
CKSF2017056/CL)
中国华能集团公司科技项目(HNKJ15-H14)
关键词
大坝横缝渗漏
缺陷检查
渗漏通道
声波CT
transverse joint leakage
defect inspection
leakage channel
acoustic CT