期刊文献+

ARINC429总线发送任务数据防冲突算法研究 被引量:5

Research on Anti-collision Algorithm for Data of Transmission Tasks on ARINC429 Bus
下载PDF
导出
摘要 在航空电子系统测试与仿真验证过程中,针对利用一条ARINC429总线进行多个Label号的周期性定时发送任务时,可能导致由不同数据字组成的发送任务在时间轴上产生时间冲突的问题.本文首先对在一根ARINC429总线上发送的任务信号之间,可能造成的时间冲突问题的时间区间展开研究,提出一种基于最小公倍周期与最大公约时间片的任务优化规划方法.通过对一条ARINC429总线上待发送的任务信号进行规划,解决了ARINC429在发送多任务时的单总线冲突问题的同时提高了总线利用率. In the process of testing, simulating and verifying the avionics system, the problem that different transmission tasks which consist of diverse data and words cause time collisions on the time axis may happen when an ARINC429 bus is used to carry out the periodic and time transmission tasks of multiple Labels. Firstly, in this paper, a research concerning the time interval of the time collisions which might be caused among the task signals transmitted on an ARINC429 bus was conducted. Secondly, a task planning method based on the least common multiple period and the time slice with the greatest common divisor was proposed. Lastly, by carrying out the planning of the task signals to be transmitted on an ARINC429 bus, the single-bus collisions in the transmission of multiple tasks on an ARINC429 bus were solved and the utilization rate of the bus was improved at the same time.
作者 孙毅刚 梅傲雪 崔海青 SUN Yi-gang;MEI Ao-xue;CUI Hai-qing(College of Electronic Informat i on and Automation. Civil Aviation University of Chin a* Tianjin 300300, China)
出处 《微电子学与计算机》 北大核心 2019年第4期93-98,共6页 Microelectronics & Computer
基金 国家自然科学基金委员会-中国民航局民航联合研究基金(U1533201)
关键词 航空电子系统 仿真验证 最小公倍周期 ARINC429 任务规划 总线冲突 Avionics system Simulation Least common period ARINC429 task planning bus collision
  • 相关文献

参考文献5

二级参考文献41

  • 1刘鲁源,万仁君,李斌.基于TTCAN协议的网络控制系统静态调度算法的研究[J].控制与决策,2004,19(7):813-816. 被引量:22
  • 2张奇智,张彬,张卫东.基于网络演算计算交换式工业以太网中的最大时延[J].控制与决策,2005,20(1):117-120. 被引量:44
  • 3顾世哲,武君胜.ARINC429测试系统设计与总线数据描述方法研究[J].航空计算技术,2006,36(3):22-24. 被引量:12
  • 4ARINC 664 Aircraft data network,part 7:avionics full duplex switched Ethernet(AFDX) network [S].
  • 5Cruz R.A calculus for net work delay,part I:net work elements in isolation [J].IEEE Trans Information Theory.1991,37 (1):114-131.
  • 6Cruz R.A calculus for net work delay,part II:network analysis [J].IEEE Trans Information Theory.1991,37(1):132-141.
  • 7Martin S,Minet P.Schedulability analysis of flows scheduled with fifo:application to the expedited forwarding class [C]//Parallel and Distributed Processing Symposium (IPDPS).Rhodes Island,Greece:20th International,2006:8-15.
  • 8Frances F,Fraboul C,Grieu J.Using network calculus to optimize the AFDX network [C]//Proceedings of ERTS.Toulouse,France: [s.n.],2006:25-27.
  • 9Bauer H,Scharbarg J L,Fraboul C.Applying and optimizing trajectory approach for performance evaluation of AFDX avionics network [C]//Proc 21th ECRTS WiP Section.Dublin,Ireland:IEEE,2009:57-60.
  • 10Bauer H,Scharbarg J L,Fraboul C.Improving the worst-case delay analysis of an AFDX network using an optimized trajectory approach [J].IEEE Trans Industrial Informatics.2010,6(4):521-533.

共引文献52

同被引文献35

引证文献5

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部