期刊文献+

改建建筑邻房安全监测及其局部基础托换 被引量:3

Safety Monitoring and Partial Foundation Replacement of an Existing Building Adjacent to a High-rise Reconstruction Building
下载PDF
导出
摘要 首先对上海某高层改建项目概况及周边环境进行概述,项目基坑周边环境复杂,需对周边环境进行安全监测;然后介绍邻房安全监测,并对沧州大楼安全监测方案和监测结果进行重点介绍和详细分析;最后对既有建筑的地基承载力、地基基础加固方案、锚杆静压桩竖向承载力、竖向荷载传递路径、基础托换施工流程及施工过程等内容进行针对性的分析和说明。 The general situation and surrounding environment of a high-rise reconstruction project locates in Shanghai are summarized in this paper firstly, the surrounding environment of the project foundation excavation is complex, and safety monitoring of the surrounding environment is required. Then, the safety monitoring of its adjacent blocks are sketched out, and the monitoring scheme and results of Cangzhou building are introduced in detail. Finally, the foundation bearing capacity of Cangzhou buildings, foundation reinforcement scheme, vertical bearing capacity of static anchor piles, vertical load transferring path , and the foundation underpinning construction process is analyzed and explained.
作者 赵俊钊 ZHAO Junzhao(Shanghai Construction No.4 (Group) Co.,Ltd.,Shanghai 201103,China)
出处 《施工技术》 CAS 2019年第6期109-112,共4页 Construction Technology
基金 上海建工集团股份有限公司重点科研项目(17JCSF-02)
关键词 加固 改造 改建 监测 地基 基础 锚杆 reinforcement reconstruction rebuild monitoring foundations basement anchor bolt piles
  • 相关文献

参考文献4

二级参考文献21

共引文献9

同被引文献10

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部