北京新机场安置房项目5标段施工中,结合工程特点、与施工部署,将BIM技术成果应用延伸到施工竣工阶段和运营服务管理阶段,确定了业主方使用BIM竣工模型的需求点和施工方在BIM竣工模型中的需求点,有针对性地为BIM模型交付做好预控措施。
Beijing housing project in the construction of the five new airport, combined with engineering characteristics and construction of deployment, the BIM technology application to the completion of construction stage and operation service management stage, determine the needs of owner party completed using BIM model and contractor in the completion of BIM model needs, targeted for BIM model delivery control counter measures.