摘要 输电线路覆冰是困扰输电企业的重要问题。本文以常见的LGJ-70/40,LGJ-240/30和L GJ-400/65等钢芯铝绞线作为研究对象,以传热学相关理论为指导,分析了钢芯铝绞线的融冰物理过程,建立了一种分析输电线路直流融冰时间的融冰模型。 Ice coating on transmission lines is one of the most important problems to power transmission companies.This paper takes the common LGJ-70/40,LGJ-240/30 and L GJ-400/65 steel-cored aluminum stranded wires as the research objects.Guided by the theory of heat transfer,this paper analyzes the physical process of ice melting of steel-cored aluminum stranded wires and establishes an ice melting model for analyzing the DC deicing time of transmission line.
作者 顾滤 GU Lv(Guiyang Bureau,EHV Transmission Company,China Southern Power Grid Co.,Ltd.,Guiyang 550000,China)
出处 《电工技术》 2019年第6期49-51,共3页 Electric Engineering
关键词 热力学 直流电 融冰电流 thermodynamics direct current ice melting current
  • 相关文献

同被引文献59

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部