在系统产能提高后,为确保污水站处理的煤气化装置灰水能够达标排放,采取了相应的改造措施。改造措施实施后,彻底解决了污水站外排水指标超标的风险。
After improvement of system production capacity, the corresponding transformation measures were taken to ensure that the ash water of coal gasification unit treated by sewage station could meet discharged standard. After the reform measures were carried out, the risk of exceeding the standard of drainage index outside sewage station was completely solved.
作者
张涛
屈政
ZHANG Tao;QU Zheng(Yankuang Guohong Chemical Co.,Ltd.,Zoucheng 273500,China;Yankuang Lunan Chemical Industry Co.,Ltd.,Tengzhou 277527,China)
出处
《化肥工业》
CAS
2019年第2期52-54,共3页
Chemical Fertilizer Industry
关键词
水煤浆气化
汽提塔
灰水
氨氮
coal water slurry gasification
stripping tower
ash water
ammonia- nitrogen