通过介绍某核电厂暖通设备自主采购的技术管理,为后续核电厂暖通设备自主采购的技术管理提供参考和借鉴。基于暖通设备自主采购的规模、类型和特点,将暖通设备从设计开始到投入运行,将暖通设备的生命周期划分为五个阶段。在不同阶段,暖通设备先后以设计文件和实物流转在不同责任方之间。通过分析不同阶段暖通设备自主采购的工作重心和特点,总结暖通设备自主采购的技术管理重点。
By introducing the technical management of independent procurement of HVAC equipment in a nuclear power plant, this paper provides a reference and reference for the technical management of independent procurement of HVAC equipment in a nuclear power plant. Based on the scale, type and characteristics of HVAC equipment independent procurement, the HVAC equipment from the beginning of the design to put into operation, the HVAC equipment life cycle is divided into five stages. In different stages, HVAC equipment has been in different responsible parties with design documents and physical circulation. By analyzing the focus and characteristics of HVAC equipment independent procurement in different stages, this paper summarizes the technical management focus of HVAC equipment independent procurement.
出处
《科技创新与应用》
2019年第15期160-163,共4页
Technology Innovation and Application
关键词
核电厂
暖通设备自主采购
技术管理
nuclear power plant
autonomous procurement of HVAC equipment
technical management