期刊文献+

高温气冷堆蒸发器用T22螺旋盘管的生产 被引量:1

Production of T22 Spiral Coil Tube for Steam Generator of HTGR
下载PDF
导出
摘要 优化了高温气冷堆蒸发器用T22螺旋盘管的制造工艺。先通过二次冷轧+一次冷拔变形,正火+回火热处理工艺,制造出换热管成品直管,再采用专用多头螺旋盘管成型机及空间弯管机对T22直管进行盘管及弯制,经外表面喷丸、真空消应力热处理、表面氧化处理、表面浸油处理等一系列工序精整加工,制造出的高温气冷堆蒸发器用盘管,经检验各项产品性能指标能够满足相关标准及用户要求。 The manufacturing process of the T22 spiral coil for the steam generator of the high temperature gas cooled reactor ( HTGR) is optimized with the methods described as below. First the finished straight tube for making the heat exchanger tube is manufactured with the process of secondary cold-roiling+primary cold-drawing deformation and the heat treatment process of normalization+tempering, and then the said straight tube is coiled and bent by the multi-head spiral coil forming machine and the space pipe-bending machine, and afterwards subjected to a number of finishing processes namely, outer surface shot blast, vacuum stress-relief heat treatment, surface oxidation treatment and surface immersion treatment, etc. The coil tube for the steam generator of the HTGR made with the methods as above mentioned is verified via relevant inspections and tests, and shows that it has its all property indexes up to applicable specifications and the customer requirements.
作者 高佩 GAO Pei(Jiangsu Yinhuan Precision Steel Tube Co., Ltd., Yixing 214203, China;School of Material Science & Engineering, Jiangsu University, Zhenjiang 212013, China)
出处 《钢管》 CAS 2019年第2期40-44,共5页 Steel Pipe
关键词 无缝钢管 螺旋盘管 蒸发器 高温气冷堆 热穿孔 冷轧(拔) seamless steel tube spiral coil tube steam generator high temperature gas cooled reactor ( HTGR) hotpiercing cold-rolling (drawing)
  • 相关文献

参考文献5

二级参考文献6

共引文献43

同被引文献15

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部