攀枝花泰隆商务大厦建筑施工技术研究

Study on Construction Technology of Panzhihua Tailong Business Building
下载PDF
导出
摘要 攀枝花泰隆国际商务大厦高层写字楼工程工期紧、施工工艺复杂,施工过程中对起重机的选择定位、深基坑支护、大体积混凝土筏板基础浇筑、粗钢筋连接、后浇带支模、竹胶板在筒体中应用和型钢外挑脚手架的应用等方面都进行了综合考虑,工程最后确保了工期、安全和质量要求,其结构获攀枝花市结构优秀奖。 The construction period of Panzhihua Tailong international business high-rise office building project is tight, and its construction process is complicated. The comprehensive consideration is implemented from the aspects of the crane positioning selection, deep foundation pit supporting, large-volume concrete raft foundation pouring, thick reinforced bar connection, post-pouring with formwork and the application of bamboo plywood on barrel and section steel out-extended scaffold. Finally, the construction period, safety and quality of the project is guaranteed. Its structure received the excellence award of Panzhihua.
作者 唐文礼 TANG Wen-li(Panzhihua Engineering & Technology Co., Ltd., Panzhihua)
出处 《冶金设备管理与维修》 2019年第2期52-55,共4页 Metallurgical Equipment Management and Maintenance
关键词 高层建筑 大型筏板基础 深基坑 型钢外挑脚手架 High-rise building large-scale raft foundation deep foundation pit section steel out-extended scaffold
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部