期刊文献+

复杂地基条件下尾矿坝的稳定性分析 被引量:4

Stability Analysis of Tailings Dam in the Condition of Complex Foundation
下载PDF
导出
摘要 通过对某三等尾矿坝的工程地质概况进行分析,确定采用压重法、排水固结与预压加载相结合、并控制加载速率的方法,解决复杂地基条件下尾矿坝稳定性不足的问题,然后进行稳定性分析计算。结果表明,某尾矿坝在空库、初期及终期不同运行工况下的安全系数均能满足规范要求。 Based on the analysis of the engineering geology situation of a tailings dam with third class, it was determined that the method of combining counter-weight method, drainage consolidation and preloading, and controlling the loading rate was adopted to solve the problem of insufficient stability of tailings dam in the condition of complex foundation, then analysis and calculation of the stability were carried out. The results showed that the safety factor of a tailings dam in different operating conditions of empty reservoir, initial stage and final stage could meet the requirements of normal.
作者 周彩霞 李世男 ZHOU Cai-xia;LI Shi-nan
出处 《有色冶金节能》 2019年第2期45-49,共5页 Energy Saving of Nonferrous Metallurgy
关键词 复杂地基 尾矿坝 稳定性 压重法 排水固结 预压加载 加载速率 complex foundation tailings dam stability counter-weight method drainage consolidation preloading loading rate
  • 相关文献

参考文献4

二级参考文献35

共引文献28

同被引文献28

引证文献4

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部