火电EPC总承包项目应用核电设计管理模式的探讨 被引量:1

Discussion on Application of Nuclear Power Design Management Mode in Thermal Power EPC General Contracting Project
下载PDF
导出
摘要 本文介绍了设计管理的重要性及其应遵循的原则,并结合国情对国内常规火力发电厂设计管理模式与核电站设计管理模式的结合进行了讨论,指出通过借鉴核电站设计管理模式的优点,可以有效提高国内火电设计效率,节约成本。同时由于涉外火电项目的增多,应用核电设计管理理念,对火电EPC总承包企业提高涉外项目竞争力,减小因设计引起的违约风险,也会起到积极作用。 This paper introduces the importance of design management and the principles it should follow,and discusses the combination of the design management mode of conventional thermal power plants and the design management mode of nuclear power plants in China in the light of the national conditions.It is pointed out that the design efficiency of domestic thermal power plants can be effectively improved and the cost can be saved by using the advantages of the design management mode of nuclear power plants for reference.At the same time,due to the increase of foreign thermal power projects,the application of nuclear power design management concept will also play apositive role for thermal power EPC general contracting enterprises in improving the competitiveness of foreign-related projects and reducing the risk of default caused by design.
作者 赵文超 ZHAO Wenchao(Nuclear Power Division,Shandong Electric Power Engineering Consulting Institute Co.,Ltd.,Jinan 250100,China)
出处 《电工技术》 2019年第8期146-148,共3页 Electric Engineering
关键词 EPC总承包 设计管理 核电项目 火电项目 涉外工程 EPC general contracting design management nuclear power projects thermal power projects foreign-related projects
  • 相关文献

参考文献3

二级参考文献12

共引文献27

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部