顶管施工关键技术研究及中航支线工程实践 被引量:20

Research on Key Technology of Pipe Jacking Construction and Practice of Zhonghang Branch Line Project
下载PDF
导出
摘要 由于地面交通和建筑物的限制,北环电网架空线改造入地工程在中航支线采用顶管法施工,顶管机选型是施工关键,根据土质情况、地下水位、施工要求和管节内径,选择泥水平衡岩石顶管机组织施工;合理布置中继间可满足顶力要求,起到接力顶进的作用;在管节外壁与土层之间注入触变泥浆,减小顶进阻力,填补管道外壁与土层间空隙,减小土体变形,支撑地层。 Due to the restriction of ground traffic and buildings,the overhead line reconstruction project of North Ring Power Grid is constructed by pipe jacking method in Zhonghang Branch Line. Pipe jacking machine selection is the key to construction. According to soil condition, groundwater level,construction requirements and pipe section diameter,mud-water balanced rock pipe jacking machine is selected to organize construction. Reasonable arrangement of relay can satisfy the roof. Thixotropic mud is injected between the outer wall of the pipe joint and the soil layer to reduce the jacking resistance,fill the gap between the outer wall of the pipe and the soil layer,reduce the soil deformation and support the stratum.
作者 吴发展 Wu Fazhan(Erchu Co.,Ltd. of China Railway Tunnel Group Sanhe 065201,China)
出处 《广东土木与建筑》 2019年第5期72-76,共5页 Guangdong Architecture Civil Engineering
关键词 顶管 顶进力 膨润土泥浆 注浆减阻 pipe jacking jacking force bentonite slurry reducing friction through injecting slurry
  • 相关文献

参考文献9

二级参考文献79

共引文献184

同被引文献108

引证文献20

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部