摘要 从供电设备的负荷分配、移动变电站的容量校核、电缆选择等多个方面对西山煤电东曲矿14218综采工作面回采设备进行了供电系统设计,并结合实践验证了14218综采工作面供电系统的安全性和稳定性,为接下来的回采工作面以及条件相类似矿井综采工作面的供电系统设计提供了参考。 From the load distribution of the power supply equipment,mobile substation capacity checking,cable selection and other aspects,this paper designed the power supply system of the mining equipment in 14218 fully-mechanized mining face of Dongqu Coal Mine of Xishan Coal Electricity Group,and verified the safety and stability of the power supply system of 14218 fully-mechanized working face combined with the practice,to provide reference for the subsequent power supply system design of mining face and similar fully-mechanized working face in mines.
作者 刘志平 LIU Zhiping(Dongqu Coal Mine, Xishan Coal Electricity Group, Shanxi Coking Coal Group, Gujiao 030200, Shanxi, China)
出处 《能源与节能》 2019年第4期160-161,共2页 Energy and Energy Conservation
关键词 东曲矿 供电系统 综采工作面 供电设计 Dongqu Coal Mine power supply system fully-mechanized mining face power supply design
  • 相关文献

参考文献4

二级参考文献14

共引文献41

同被引文献20

引证文献6

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部