期刊文献+

海上风机基础灌浆连接段压弯性能有限元分析 被引量:3

Numerical Analysis of Grouted Connection for Offshore Wind Turbine Substructures
下载PDF
导出
摘要 灌浆连接段在海上风机支撑结构中得到了广泛运用。由于灌浆连接段独特的几何构成,其内部浆体的变形和应力状态难以用试验方式得到。因此,基于已有试验结果,利用有限元软件ABAQUS对灌浆连接段试件在压弯荷载下的力学性能进行了分析。将有限元分析结果与试验结果对比,从试件破坏形态、荷载-位移曲线和钢管纵向应变分布三方面验证了有限元模型的可靠性。基于有限元分析结果,对灌浆连接段浆体及钢管的应力分布和变形进行深入分析,进而得到了灌浆连接段压弯荷载的传递机理。研究结果表明:灌浆连接段主要通过形成灌浆料斜压短柱来将荷载从套管传递至桩管,且钢管的破坏先于灌浆体。 The grouted connection has been widely used in offshore wind turbine support structures.Due to the unique geometrical structure,it is difficult to obtain the deformation and stresses distribution of the grout through experiment study.Therefore,mechanical behaviors of the grouted connections under combined bending and axial loading were studied by using finite element software ABAQUS.The numerical results were verified by the experimental results with comparisons of failure modes,load displacement curves and longitudinal strain distribution of steel tubes.Furthermore,the stress distribution and deformation of the grout,the inner and outer steel tube were analyzed in depth,thus the load transmission mechanism of the grouted connection was clarified.The results show that the grout transfer load from the sleeve to the pile through the formation of oblique compression struts,and the damage of the steel pipe precedes the grout failure.
作者 陈涛 张持海 赵淇 王衔 元国凯 刘晋超 CHEN Tao;ZHANG Chihai;ZHAO Qi;WANG Xian;YUAN Guokai;LIU Jinchao(Department of Structural Engineering,Tongi University, Shanghai 200092,China;China Energy Engineering Group Guangdong Electric Power Design Institute, Guangzhou 510663, China)
出处 《结构工程师》 北大核心 2019年第2期93-100,共8页 Structural Engineers
基金 国家重点研发计划(2017YFC1500704)
关键词 海上风机基础 灌浆连接段 压弯荷载 有限元 offshore wind turbine foundation grouted connection axial compression and bending load finite element analysis
  • 相关文献

参考文献4

二级参考文献32

  • 1吴建营,李杰.混凝土的连续损伤模型和弥散裂缝模型[J].同济大学学报(自然科学版),2004,32(11):1428-1432. 被引量:18
  • 2叶列平.混凝土结构[M].北京:清华大学出版社,2005
  • 3Hibbitt,Karlsson,Sorensen.ABAQUS/Standard User Subroutines Reference Manual[M].USA:The Pennsylvania State University,1998:1-200.
  • 4Model Code 90,CEB-FIP[S].Lausanne:Mai,1993.
  • 5Lubliner J,Oliver J,Oller S,Onate E.A plastic-damage model for concrete[J].International Journal of Solids and Structures,1989,25(3):299-326.
  • 6Lee J,Fenves G L.Plastic-damage model for cyclic loading of concrete structures[J].Journal of Engineering Mechanics Division-ASCE,1998,124(8):892-900.
  • 7Kachanov L M.Rupture time under creep conditions[J].International Journal of Fracture,1999,97(1/2/3/4):11-18.
  • 8Belarbi A,Hsu T T C.Constitutive laws of softened concrete in biaxial tension-compression[J].ACI Structural Journal,1995,92(5):562-573.
  • 9Mohamad Mansour,Lee Jung-Yoon,Hsu Thomas T C.Cyclic stress-strain curves of concrete and steel bars in membrane elements[J].Journal of Structural Engineering,2001,127(12):1402-1411.
  • 10Vecchio F J,Collins M P.The modified compression-field theory for reinforced concrete elements subjected to shear[J].ACI Structural Journal,1986,83(2):219-231.

共引文献323

同被引文献23

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部