摘要
文中采用新技术对某石油化工变电所的电力系统进行了优化升级改造,提高该电力系统的安全性及可靠性。通过对B4、B5变电所的整合改造的实例,证实了电力系统的优化运行的可行性,提高了变电所供电的安全可靠性,保障了化工、炼油等装置的平稳运行。
New technology is used to make optimization and upgrading reconstruction to a petrochemical power substation to improve the safety and reliability of this power system. With B4 and B5 substation integration reconstruction as the example, the feasibility of optimization operation of the power system is verified, the safe reliability of substation power supply is improved, and the smooth operation of chemical plants and oil refinery is guaranteed.
作者
兰永良
Lan Yongliang(Water & Gas Plant of PetroChina Daqing Petrochemical Company, Daqing 163714,China)
出处
《炼油与化工》
2019年第2期62-64,共3页
Refining And Chemical Industry
关键词
石油化工
电力系统
优化
高压柜
petrochemical engineering
power system
optimization
high-voltage cabine