摘要
变电站综合自动化改造过程中,为了保证远动数据信号能正常上传电力调度中心,确保电网调度员能第一时间监控变电站电气设备的运行情况,远动通信改造是其中重要的一部分。为此,介绍了远动通信改造中存在的问题和解决方法等。
In the process of substation comprehensive automation transformation, in order to ensure the normal upload of remote data signal power dispatching center, to ensure that the power grid dispatcher can monitor the operation of substation electrical equipment in the first time, remote communication transformation is an important part of it. This paper mainly introduces the problems and solutions faced in the transformation of remote communication.
作者
毕静
BI Jing(Power supply Department of Henan Energy Chemical Group Jiaozuo Coal Industry Company,Jiaozuo 454000,China)
出处
《电工技术》
2019年第7期101-101,108,共2页
Electric Engineering
关键词
变电站
综合自动化
远动通信改造
substationremote
comprehensive automation
communication transformation