摘要
施工过程中出现的问题不能有效预测,造成施工缓慢,工期延长。基于BIM技术和三维模拟软件Navisworks对面板堆石坝的施工过程进行动态模拟,设定不同评价指标将BIM技术的应用情况采用灰色系统理论进行评价。结果表明:BIM技术可以很好地应用于面板堆石坝的施工管理中,并且技术应用的成熟度较高,可有效提高工程施工效率。
The problems occurring during the construction process cannot be effectively predicted, resulting in slow construction and delayed the construction period. Based on BIM technology and 3 D simulation software Navisworks, the dynamic simulation of the construction process of the face rockfill dam is carried out, and different evaluation indexes are set to evaluate the application of BIM technology by the gray system theory. The results show that BIM technology can be applied to the construction management of concrete face rockfill dams, and the maturity of technical application is high,which can effectively improve the engineering construction efficiency.
作者
陈园
Chen Yuan(Xinjiang Water Resources and Hydropower Survey and Design Institute Urumqi 830000,Xinjiang)
出处
《陕西水利》
2019年第4期149-152,共4页
Shaanxi Water Resources
关键词
面板堆石坝
BIM
施工管理
灰色系统
Face rockfill dam
BIM
construction management and grey system