期刊文献+

计及电转气设备的小水电站优化运行分析 被引量:1

Optimal Operation Analysis of Small Hydropower Considering Power to Gas Facilities
下载PDF
导出
摘要 丰水期时小水电无法满发运行,成为阻碍水电资源的高效利用的重要因素。电转气(Power to Gas,P2G)设备的发展为多能互补,提升水电利用效率提供了新的手段。以小水电站收益最大为目标,构建了含P2G设备的小水电站经济运行模型。分析对比了P2G设备在不同时期对小水电站运行的影响,并进一步对比了平水期时P2G设备和储能设备对运行的影响。仿真验证了P2G设备对提升水电利用效率的有效性。 Small hydropower can't maximize its benefits in the wet period which impedes the efficient use of hydropower resources.The development of power to gas(P2G)facilities was multi-complementary to provide the new means for the improvement of hydroelectric utilization efficiency.This paper established a small hydropower economic operation model taking the maximal profit of small hydropower as the goal,and analyzed and compared the impact of P2G facilities on the operation of small hydropower stations in different periods.Furthermore,this paper compared the impact of P2G facilities and energy storage facilities on operation in the normal season.The simulation shows the effectiveness of P2G facilities in improving hydropower efficiency.
作者 王力 王玕 WANG Li;WANG Gan(SPIC Northeast Electric Power Co.,Ltd,Shenyang 110179,China;School of Electrical Engineering,Guangzhou College of South China University of Technology,Guangzhou 510800,China)
出处 《电工电气》 2019年第5期30-32,57,共4页 Electrotechnics Electric
关键词 小水电站 电转气设备 储能设备 经济运行 small hydropower power to gas facilities energy storage facilities economic operation
  • 相关文献

参考文献7

二级参考文献62

共引文献245

同被引文献9

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部