期刊文献+

大倾角煤层综采设备快速安装工艺 被引量:2

Rapid Installation Technology of Fully Mechanized Mining Equipment in Large Inclination Coal Seam
下载PDF
导出
摘要 以李雅庄煤矿607大倾角工作面为研究背景,提出了一种快速安装工艺,并对比分析了新工艺和传统工艺各自的特点。通过现场试验证明了新工艺能够实现大倾角煤层综采设备的快速安装。这将会给矿井的生产带来巨大的经济效益。 Taking the 607 large inclination face of Liyazhuang Coal Mine as the research background,this paper puts forward a rapid installation process,and compares and analyzes the characteristics of the new technology and the traditional technology. Through field test,it is proved that the new technology can realize the quick installation of fully mechanized mining equipment in large dip coal seam. This will bring huge economic benefits to mine production.
作者 张建民 Zhang Jianmin(Shengli Coal Coke Co.,Ltd.,Lyuliang Shanxi 033209)
出处 《机械管理开发》 2019年第4期165-166,186,共3页 Mechanical Management and Development
关键词 综采工作面 安装技术 支架安装 采煤机 安装顺序 fully mechanized mining face installation technology support installation shearer installation sequence
  • 相关文献

参考文献3

二级参考文献11

共引文献33

同被引文献7

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部