新建铁路跨既有高速铁路转体桥施工关键技术探讨 被引量:3

Discussion on Key Technologies for Construction of New Railway Rotary Bridge Crossing Existing High Speed Railway
下载PDF
导出
摘要 结合衢宁铁路的工程特点,为确保既有高速铁路运营安全,减少或消除对既有高速铁路的影响,同时,保证工程能够优质、安全、快速的完成,跨温福线特大桥22主墩采用转体桥方案。即先进行承台、球铰及牵引系统施工,主墩采用翻模施工,连续梁采用挂篮施工,然后,在封锁要点后进行平转体,在高速铁路铁路外侧合拢。文章以该工程为例,对转体桥施工的关键技术与控制要点进行了探讨,对今后类似上跨既有高速铁路提供借鉴经验。 Combined with the engineering characteristics of Quning Railway,in order to ensure the safety of the existing highspeed railway operation,reduce or eliminate the impact on the existing high-speed railway,and ensure that the project can be completed with high quality,safety and speed,the swivel bridge scheme is adopted for the 22 main piers of the Wenford Bridge. Pile cap,spherical hinge and traction system are constructed first,main pier is constructed by turning over formwork,continuous beam is constructed by hanging basket,and then horizontal rotation is carried out after blocking key points,and the outer side of high-speed railway is closed. Taking this project as an example,this paper discussed the key technology and control points of swivel bridge construction,and provided reference experience for similar high-speed railway in the future.
作者 彭学军 PENG Xue-jun(The First Engineering Co.,Ltd.,China Railway No.5 Group,Changsha,Hunan 410117,China)
出处 《企业技术开发》 2019年第4期42-44,47,共4页 Technological Development of Enterprise
关键词 新建铁路 上跨既有 转体桥 施工技术 New railway Upper span existing Swing bridge Construction technique
  • 相关文献

参考文献3

二级参考文献8

共引文献41

同被引文献18

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部