期刊文献+

超高层建筑设备吊装技术 被引量:3

Hoisting Technology for Super High-Rise Building Equipment
下载PDF
导出
摘要 以上海中心大厦机电安装过程中的吊装作业为案例,分析了超高层建筑项目中大型设备吊装的难点和特点。介绍了BIM软件在吊装技术中的运用,重点阐述了设备吊装的重心位移法和移动平台拖运法这2种吊装方法。大型设备吊装技术的成功实施,为国内500 m以上高度建筑的材料与设备吊装提供了成功案例。 Taking the hoisting operation in the electromechanical installation process of Shanghai Tower as an example, the difficulties and characteristics of large equipment hoisting in super high-rise building projects are analyzed. This paper also in troduces the applicati on of BIM software in the hoisting technology, and focuses on two types of hoisti ng methods: the barycentric displacement method and the mobile platform haulage method. The successful practice of large equipme nt hoisti ng tech no logy has provided a successful case for the hoisting of materials and equipment at a height of more than 500 m buildings in China.
作者 黄震 HUANG Zhen(Shanghai Installation Engineering Group Co., Ltd., Shanghai 200080, China)
出处 《建筑施工》 2019年第4期654-656,共3页 Building Construction
关键词 超高层建筑 设备吊装 BIM模拟 移动平台拖运法 super high-rise building equipment hoisting BIM simulation mobile platform haulage method
  • 相关文献

参考文献5

二级参考文献22

共引文献39

同被引文献16

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部