期刊文献+

儒乐湖大桥的设计 被引量:1

Design of Rule Lake Bridge
下载PDF
导出
摘要 以儒乐湖大桥为工程背景,介绍了该桥的设计方案比选与计算分析。该桥采用(25+40+50+3×60+50+40+25)m=410m连续梁拱组合式桥梁,采用midas Civil软件对其拱脚V撑进行模拟分析,得出有意义的结论。根据计算结果,该桥拱肋在设计荷载作用下具有足够的安全性,并具有一定承受超载的能力。 Taking Rule Lake Bridge as the engineering background, this paper introduces the comparison, calculation and analysis of design schemes for this bridge. This bridge is a 410-m (25 m+40 m+50 m+3× 60 m+50 m+40 m+25 m)-span continuous beam arch composite bridge. The MIDAS Civil software is used to simulate and analyze the V-support arch foot of this bridge. The significant conclusion is achieved. Based on the calculation result, the arch rib of this bridge has the sufficient security under the design load effect, and has a certain capacity of bearing the overload.
作者 周细辉 Zhou Xihui
出处 《城市道桥与防洪》 2019年第5期93-94,M0012,共3页 Urban Roads Bridges & Flood Control
关键词 拱梁组合 桥梁设计 结构分析 arch and beam combination bridge design structure analysis
  • 相关文献

参考文献1

二级参考文献3

  • 1[2]Hambly E C.Bridge Deck Behaviour[M],London:E&FN Spon,1976.
  • 2[3]O'Brien E J,Keogh D L.Neutral Axis Variation in Bridge Decks[A].In:Third International Con-ference on Computational Structures Technology[C].Budapest:Civil-Comp Press,1996.
  • 3[4]O'Brien E J,Keogh D L.Upstand finite element analysis of slab bridge[J],Computers & Struc-tures,1998,69(6):671-683.

共引文献53

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部