桩基托换在鄂尔多斯大道桥扩建工程中的应用

Application of Pile Foundation Underpinning in Ordos Avenue Bridge Extension Project
下载PDF
导出
摘要 结合鄂尔多斯大道桥扩建工程桩基托换技术方案的论证与实施,阐述了桩基托换的相关影响因素和相应的解决措施。桩基托换的前期规划设计应力求具有全局性、前瞻性、可行性;可有效解决改扩建工程中新旧构筑物基础相冲突的问题;应注重工程设计与施工的过程控制,综合多学科技术优势及技术手段。桩基托换技术在该工程的应用取得了良好的工程效果。 Combined with the demonstration and implementation of the pile foundation underpinning technical scheme for Ordos Avenue Bridge Extension Project, this paper sets forth the relative influence factors and the relevant solving measures of pile foundation underpinning. The preliminary planning and design of pile foundation underpinning should strive to have the globality, foresight and feasibility, can effectively solve the conflicting problems between the old and new structure foundations in this extension project, should pay attention to the process control of engineering design and construction, and synthesize the multidisciplinary technological superiority and technical means. The application of pile foundation underpinning technology has achieved the good engineering effect in this project.
作者 王雪松 栗燕娜 Wang Xuesong;Li Yanna
出处 《城市道桥与防洪》 2019年第5期167-169,M0019,共4页 Urban Roads Bridges & Flood Control
关键词 桩基托换 同步顶升 扩建工程 pile foundation underpinning synchronized jacking extension project
  • 相关文献

参考文献4

二级参考文献15

  • 1陈远元,程刚.桩基托换技术研究与设计[J].广东土木与建筑,2005,12(10):15-16. 被引量:7
  • 2杨晓杰,邓飞皇,聂雯,李桂刚.地铁隧道近距穿越施工对桩基承载力的影响研究[J].岩石力学与工程学报,2006,25(6):1290-1295. 被引量:104
  • 3Y. lwasaki, H. Watanabe, M. Fukuda, A. Hirata & Y. Hori, Construction control for underpinning piles and their behavior during excavation [ J ]. Geotechnique, dd(4), 1994, 681-689.
  • 4J.S. Sharma, A.M. Hefny, J. Zhao, C.W. Chan, Effect of large excavation on deformation of adjacent MRT tunnels [ J ]. Tunnelling and Underground Space Technology, 16 (2001) 93-98.
  • 5Yanyong Xiang, Zhiping Jiang, Haijian He. Assessment and control of metro-construction induced settlement of a pile-supported urban overpass [ J]. Tunnelling and Underground Space Technology, 23 (2008) 300-307.
  • 6T. lshimura, M. Metoki, M. Shimizu. Development of removed pile method with cutting [ J ]. Tunnelling and Underground Space Technology, 21 (2006) 411-412.
  • 7《城市桥梁设计荷载标准》(CJJ 77-98).北京:中华人民共和国行业标准,1998.
  • 8《地基基础设计规范》(DGJ 08-11-1999).上海:上海市工程建设规范,1999.
  • 9.《桩基工程手册》.北京:中国建筑工业出版社,1995..
  • 10涂强.大轴力桩基托换变形控制值确定[J].铁道工程学报,2008,25(2):26-30. 被引量:19

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部