摘要
以嵩昆路(K18+900-K19+800)段高填方路基填筑为例,对土石混填施工的前期准备工作及技术控制要点进行分析,可为土石混填路基的施工管理提供相应的参考与借鉴。
Taking a high-fill subgrade filling of Songkun Road (K18 + 900 - K19 + 800) as an example, this paper analyzes the first-phase preparations and technical control essentials of soil-stone filling construction, which can be referred for the construction management of soil-stone filling subgrade.
出处
《城市道桥与防洪》
2019年第5期190-191,M0021,共3页
Urban Roads Bridges & Flood Control
关键词
土石混填
冲击碾压
高填方
soil-stone filling
impact rolling compaction
high fill