摘要
在工程项目建设过程中,大跨度焊接钢箱梁斜拉桥的施工控制技术具有多元性和温度效应影响明显的特点。根据这些特点,使用合理的施工控制技术可以有效保证施工过程的顺利推进,提高施工控制的精度。论文以大黑河斜拉桥为例,对大跨度焊接钢箱梁斜拉桥施工控制技术进行进一步的阐述,希望能为相关工程建设提供一定的参考和建议。
In the process of project construction,the construction control technology of long-span welded steel box girder cable-stayed bridge is characterized by diversity and obvious influence of temperature effect.According to these characteristics,the reasonable use of construction control technology can effectively ensure the smooth progress of the construction process,improve the accuracy of construction control.Taking Daheihe cable-stayed bridge as an example,this paper further elaborates the construction control technology of long-span welded steel box girder cable-stayed bridge,it is hoped that this can provide some reference and suggestions for relevant engineering construction.
作者
马非
MA Fei(The Investment Division of CCCC Fourth Highway Engineering Co.Ltd.,Hohhot 010000,China)
出处
《中小企业管理与科技》
2019年第10期153-154,共2页
Management & Technology of SME
关键词
大跨度焊接
钢箱梁
斜拉桥
施工控制
long-span welding
steel box girder
cable-stayed bridge
construction control