摘要
红沿河核电站二期GD廊道距商运的4#核电机组较近,爆破阈值较小,通过对爆破震动理论进行深入的研究,决定采用综合减震技术。经现场监测,在GD廊道爆破开挖过程中起到了很好的减震效果,为后期类似环境施工提供了有力的借鉴。
The GD corridor of Hongyanhe Nuclear Power Station Phase Ⅱ is close to the commercial 4 # nuclear power unit, with a small blasting threshold.The synthetic damping technique is adopted after the deep research of blasting vibration theory .After on-site monitoring, it has played a good effect of shock absorption in the process of GD corridor blasting excavation.
出处
《科学技术创新》
2019年第10期128-129,共2页
Scientific and Technological Innovation
关键词
综合减震技术
爆破试验
单排/双排减震孔
The comprehensive vibration reduction technology
Blasting test
Single row / double row vibration reduction hole