在市政桥梁施工的过程中,支架虽然只是起到了暂时性的支撑作用,但是与整个施工过程的安全以及梁体的计算精度有很大关系。文章结合某市政桥梁工程实例,介绍了满堂支架现浇箱梁施工要点,分析了施工工程中可能出现的问题,并提出相应的对策。
During the municipal bridge construction,although the support only plays a temporary supporting role,it has a great relationship with the safety of the whole construction process and the calculation accuracy of the beam.Based on the example of a municipal bridge project,this article introduces the main construction points of full-support cast-in-place box girder,analyzes the problems that may occur in the construction project,and proposes the corresponding countermeasures.