期刊文献+

铁路线路改线引起的通信机房搬迁及过渡方案的讨论 被引量:6

Relocation and Transition Plan of Telecommunication Room Caused by Railway Line Transformation
下载PDF
导出
摘要 针对铁路机房搬迁的方法,结合铁路通信设备、电源、光电缆及房屋的实际情况,依托陇海线三门峡改线工程,对铁路机房搬迁过程可能出现的各种问题进行讨论,为以后类似工程提供经验。 According to the actual situation of railway communication equipment, power supply, optical cable and house, combining with the Sanmenxia relocation project of Longhai line, this paper discusses the relocation methods and the possible problems in the process of the relocation of the railway machine room, so as to provide experience for this kind of project in the future.
作者 赵春和 Zhao Chunhe(Zhengzhou branch,China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Zhengzhou 450001,China)
出处 《铁路通信信号工程技术》 2019年第5期38-41,共4页 Railway Signalling & Communication Engineering
关键词 机房过渡搬迁 传输及接入 既有铁路线路改线 transition and relocation of machine room transmission and access existing railway line transformation
  • 相关文献

参考文献4

二级参考文献10

共引文献10

同被引文献33

引证文献6

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部