摘要
针对铁路机房搬迁的方法,结合铁路通信设备、电源、光电缆及房屋的实际情况,依托陇海线三门峡改线工程,对铁路机房搬迁过程可能出现的各种问题进行讨论,为以后类似工程提供经验。
According to the actual situation of railway communication equipment, power supply, optical cable and house, combining with the Sanmenxia relocation project of Longhai line, this paper discusses the relocation methods and the possible problems in the process of the relocation of the railway machine room, so as to provide experience for this kind of project in the future.
作者
赵春和
Zhao Chunhe(Zhengzhou branch,China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Zhengzhou 450001,China)
出处
《铁路通信信号工程技术》
2019年第5期38-41,共4页
Railway Signalling & Communication Engineering
关键词
机房过渡搬迁
传输及接入
既有铁路线路改线
transition and relocation of machine room
transmission and access
existing railway line transformation