期刊文献+

一种大电流互感器一、二次同步接线装置

A Primary-Wires and Secondary-Wires Synchronous Connection Device for Testing Low-Voltage Current Transformer
下载PDF
导出
摘要 介绍了一种新型测试计量用大电流互感器一、二次同步接线的装置,以及该装置的总体设计、主要技术参数及各部件的主要结构特点。该装置在实际测试中使用效果良好,确实能减轻测试人员重复繁琐的一、二次接线工作,也能够有效地消除接线过程中存在的安全隐患,在验收、检测和常规工作中发挥了重要作用。 This article describes one kind of new device,which is applied to low-voltage current transformer test to connect primary wires and secondary wires at the same time.It also introduces the integrated design,general technical parameters and main structural characteristics of the equipment.The condition of this machine is good in the experimental process.It relieves testers from connecting wires over and over again and it can also remove the potential safety hazard effectively in the process of the connection.The equipment plays an important part in checking,testing and regular work.
作者 胡玉松 王建国 陈石岗 赵昕 HU Yu-song;WANG Jian-guo;CHEN Shi-gang;ZHAO Xin(Yunnan Power Grid Co.,Ltd.,Kunming Power Supply Bureau,Kunming 650000,China;Shanxi Design and Research Institute of Mechanical and Electrical Engineering,Taiyuan 030009,China)
出处 《机械工程与自动化》 2019年第3期122-123,共2页 Mechanical Engineering & Automation
关键词 电流互感器 一次 二次 同步接线 current transformer primary secondary connect at the same time
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部