随着桥梁运营中的老化和超载,使得旧桥出现了病害。因此,对旧桥的承载能力进行评估显得十分必要。结合工程实例,对旧桥进行静载试验,从而评估其承载能力,为管理部门对桥梁安全运营管理提供决策依据。
With the aging and overloading of the bridge operation, the old bridge has become sick. Therefore , it is necessary to evaluate the carrying capacity of the old bridge. Combined with the engineering cases, the old bridge is subjected to static load test to evaluate its carrying capacity, which provides the decision - making basis for the management department to manage the bridge safety operation.
作者
王伟
Wang Wei(Fujian Forestry Vocational and Technical College,Nanping,Fujian 353000,China)
出处
《黑龙江工业学院学报(综合版)》
2019年第5期65-69,共5页
Journal of Heilongjiang University of Technology(Comprehensive Edition)
基金
福建省教育厅中青年教师教育科研项目(编号:JAT170991)
关键词
箱型梁桥
静载试验
承载能力
Box girder bridge
static load test
bearing capacity