摘要
郭大寨水库营盘山隧洞出口段边挖边衬的施工案例,在一定程度上解决了不良地质隧洞段在初期支护后发生变形的问题,并加快了施工进度,节约了工期,为同类工程提供借鉴。
The construction case of lining while excavation at the exit section of Yingpanshan tunnel in Guodazhai reservoir solved the problem of deformation after initial support in bad geological tunnel section to some extent, and accelerated the construction progress and saved the construction period. Hoping to provide reference for similar projects.
作者
贺志
HE Zhi(Yunnan Jiantou First Water Conservancy and Hydropower Construction Co. Ltd.,Kunming 650217,China)
出处
《工程建设与设计》
2019年第10期81-82,共2页
Construction & Design for Engineering
关键词
小断面
长隧洞
边挖边衬
small section
long tunnel
lining while excavation