摘要
对膨胀土提出了加入纤维或风化砂的2种改良方法,建议施工过程中严格控制施工目标、施工过程和施工材料,在质量控制方面要求考察施工的环境,制定详细的施工路线并完善管理制度。
In this paper, two improved methods of adding fiber or weathered sand to expansive soil are put forward, and it is suggested to strictly control the construction target, construction process and construction materials in the construction process, inspect the construction environment, formulate detailed construction route and improve the management system in terms of quality control.
作者
童荣
TONG Rong(CCCC No.2 Highway Survey and Design Research Institute Co. Ltd.,Wuhan 430056,China)
出处
《工程建设与设计》
2019年第10期83-84,共2页
Construction & Design for Engineering
关键词
高速公路
施工质量控制
路基膨胀土
改良方法
expressway
construction quality control
expansive soil of subgrade
improvement method