深大钻孔灌注桩成孔阶段主要施工措施——以石首长江大桥桩基工程为例 被引量:4

Main Construction Measures of Deep Bored Cast-in-Place Pile at the Pore Forming Stage——Taking the Pile Foundation Engineering of Shishou Yangtze River Bridge as an Example
下载PDF
导出
摘要 施工环境、地质条件、水文条件、生产设备等诸多因素,直接影响工程施工的顺利施实。论文总结了石首长江公路大桥桥墩桩基施工过程中的施工措施,以供参考。 The construction environment, geological conditions, hydrological conditions, production equipment and many other factors will directly affect the smooth construction of the project. This paper summarizes the existing construction measures in the construction of pier foundation-pile foundation of Shishou Yangtze River highway bridge, for reference.
作者 王树元 崔林林 WANG Shu-yuan;CUI Lin-lin(Tianj in Bureau of Geology and Mineral Resources,Tianjin 300191,China;Institute of Geomine Survey and Design,Jilin Province,Changchun 130000,China)
出处 《工程建设与设计》 2019年第10期135-136,共2页 Construction & Design for Engineering
关键词 钻机选择 垂直度控制 施工平台 drill selection vertical degree control construction platform