摘要
改革开放以来,我国社会经济快速发展,也促进了我国建设行业的飞速发展,同时,进行建设施工时,通过利用先进的技术,能够提高管理质量和水平,实现建设工程项目的良好实施。因此,针对建设工程施工进度控制,很多施工企业采用了BIM技术。论文分析了地铁施工中影响施工进度的因素,并对BIM技术在地铁施工进度控制中的应用进行介绍,希望通过论文的探讨,能够为相关方面的研究提供参考。
Since the reform and opening up, China’s economy is developing rapidly, which promotes the rapid development of China’s construction industry, at the same time, in the construction, through the use of advanced technology, the quality and level of management can be improved, and achieve good implementation of construction projects. Therefore, many construction enterprises adopt BIM technology for construction schedule control. This paper analyzes the factors that influence the construction progress in subway construction, and introduces the application of BIM technology in subway construction progress control, hoping to provide reference for relevant research through the discussion of this paper.
作者
李泓睿
LI Hong-rui(Lanzhou Jiaotong University,Lanzhou 730070,China)
出处
《工程建设与设计》
2019年第10期238-239,共2页
Construction & Design for Engineering
关键词
BIM技术
建设工程
施工进度
控制
BIM technology
construction projects
construction progress
control