摘要 2018年3月21日巴西±800 kV欣古换流站因技术缺陷导致连锁反应,出现波及全国的大面积停电事故,对巴西北部和东北部14州造成重大影响。本文简要介绍了巴西电网的概况、事故的发展过程,初步分析了巴西3.21大停电事故的主要原因。从继电保护、安全稳定装置配置及策略分析、电厂一次调频特性等方面对祁韶直流的相应环节展开分析评估,结合湖南电网实际,总结了此次大停电事故经验教训。 The technical defects of Brazil ±800 kV Xingu convertor station led to chain reaction on March 21st, 2018. Widespread power outages affecting the entire country have had a significant impact in 14 northern and north-eastern Brazilian states. The general situation and the course of the accident of Brazilian power grid are introduced briefly in the paper. Furthermore, the main causes of the accident are analyzed in this article. On the basis of Brazilian blackout, Qishao DC transformation line is evaluated from the relay protection, configuration and strategy analysis of security and stability equipment, primary frequency regulation of power plants. Considering the actual condition of Hunan power grid, the lessons from Brazilian blackout on March 21st are summarized.
作者 柳永妍 左剑 呙虎 李晨坤 LIU Yongyan;ZUO Jian;GUO Hu;LI Chenkun(State Grid Hunan Electrical Power Company Limited Research Institute, Changsha 410007, China)
出处 《湖南电力》 2019年第2期25-29,共5页 Hunan Electric Power
关键词 巴西电网 大停电 安全防线 事故分析 Brazil power grid blackout safety line accident analysis
  • 相关文献

参考文献5

二级参考文献48

共引文献306

同被引文献48

引证文献4

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部