摘要
本文充分考虑线路线型、居民出行、客流吸引、土地综合开发、城镇发展、交通影响、环境影响等因素,探讨头陀地区线路通道方案和站位方案设计。通过分析可得出,线路通道方案选取头陀镇北线通道方案,站位方案采用白湖塘北侧设站方案。
This paper fully considered the line type, residents’ travel, passenger attraction, land comprehensive development, urban development, traffic impact, environmental impact and other factors, discussed the Toutuo area route and station design. Through analysis, it can be concluded that Toutuo Town North Line Channel Scheme is selected as the route channel scheme, and Baihutang North Line Station Scheme is adopted as the station location scheme.
作者
罗金泉
LUO Jinquan(China Railway Siyuan Survey and Design Group Co., Ltd.,Wuhan Hubei 430063)
出处
《河南科技》
2019年第5期106-108,共3页
Henan Science and Technology
关键词
市域铁路
头陀地区
站位
方案
city railway
Toutuo district
station location
scheme