以大石桥站咽喉区改造工程为例,结合信号过渡工程中遇到的相关问题,阐述在过渡工程中,既有联锁道岔拆除、插入新道岔及电码化临时过渡的技术处理办法。实践证明,该方法能满足信号过渡工程的要求,确保既有联锁关系的安全,减少对正常行车的干扰,并达到了降低造价的目的。对其他类似工程也有借鉴意义。
Taking the reconstruction of the throat area of Dashiqiao station as example,technical treatment methods of dismantling existing interlocking switches and placing in new ones and coding of temporary transition are described in combination with related problems in the transition project.Practices have proved that the methods can meet the requirements of signal transition projects and the methods not only ensure the safety of the existing interlocking relationship but also minimize the disturbance on normal operation and reduce the cost as well,offering reference for other similar projects.