介绍了2座6 m焦炉的工程概况,分析了焦炉端部火道炉墙损坏的主要外因及采用熔融硅砖对端部火道进行揭顶翻修的优点。通过揭顶翻修解决了端部火道炉墙破损、变形及炉头冒烟着火问题,且较使用普通硅砖总工期缩短约110天,可减少焦炭损失约23 210 t,2座焦炉的焦炭产量较维修前提升了50%以上。
This paper introduces the conditions of two blocks of 6 m coke ovens and analyzes the main causes of end flue damage as well as the advantages of re-bricklaying for oven end flues with low expansion rate silica bricks by uncovering from battery roof.Thus solutions can be given to the damage and deformation on heating wall at end flues and the oven end emission escaping and flaming as well.Compared with using ordinary silica bricks, the overall time schedule can be shortened by around 110 days, coke can be saved by 23 210 tons approximately and coke output can be increased by 50% plus.
作者
张雷
王宝瑞
刘潇
杨冠楠
蔡润珂
Zhang Lei;Wang Baorui;Liu Xiao;Yang Guannan;Cai Runke(ACRE Coking & Refractory Engineering Consulting Corporation, MCC, Dalian 116085 , China)
出处
《燃料与化工》
2019年第3期33-35,共3页
Fuel & Chemical Processes
关键词
焦炉
端部火道
熔融硅砖
揭顶翻修
Coke oven
Oven end flues
Low expansion rate silica bricks
Re-bricklaying by uncovering from battery roof