摘要
地铁车站施工项目,规模较大,施工结构比较复杂,难度也很大,从而需要相关工作人员能够采取科学合理有效的技术来进行施工。以地铁车站明挖施工技术控制要点为主线,进行简要的分析和描述。
As far as the construction of the subway station is concerned, the scale is large,the construction structure is complicated, and the difficulty is also great, so that the relevant staff can adopt scientific and reasonable technology to carry out the construction. Briefly analyze and describe the main points of the construction technology control of the subway station.
出处
《建筑技术开发》
2019年第9期75-76,共2页
Building Technology Development
关键词
地铁车站
明挖施工技术
控制要点
subway station
open excavation construction technology
control points