通过对岩溶区桩基础施工存在的难点进行分析,研究出相应的对策,并对岩溶区嵌岩桩施工原理、施工中难点及重点、施工过程、施工关键点进行分析,可以为相似工程提供。
Through the analysis of the difficulties in pile foundation construction in Karst areas, the corresponding countermeasures are studied,and the construction principle, difficulties and key points in construction, construction process and key points in construction of rock-socketed piles in karst areas are analyzed,hoping to provide reference for similar projects.