期刊文献+

CRH5A动车组底架边梁修补方案及强度分析 被引量:2

Repair plan and strength analysis of side frame of CRH5A EMU underframe
下载PDF
导出
摘要 在CRH5A型动车组上,底架边梁的滑槽难免因制造异常而产生缺陷,针对滑槽修复分别介绍了几种不同的修补方案。对单侧滑槽修补、整体滑槽修补、整体替换底架边梁等方案进行了详细的强度计算及对比分析。其修补过程中的结构设计、强度理论计算等均可为后续底架边梁的修复提供重要参考依据。 On the CRH5A EMU,the chutes of the underframe side beams are inevitably defective due to manufacturing anomalies. This paper introduces several different repairing schemes for chute repair. Detailed strength calculation and comparative analysis were carried out for the single-side chute repair,the overall chute repair,and the overall replacement of the underframe beam. The structural design and strength theory calculation in the repair process can provide an important reference for the subsequent repair of the side frame beam.
作者 鲍洪阳 BAO Hongyang(CRRC Changchun Railway Vehicles Co.,Ltd.,Changchun 130062,China)
出处 《电焊机》 2019年第5期92-95,共4页 Electric Welding Machine
关键词 底架边梁 焊修 强度计算 underframe side beam welding repair strength calculation
  • 相关文献

参考文献2

二级参考文献2

共引文献49

同被引文献22

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部