摘要 本文对国内某百万伏项目主变低压侧、中性点套管的多起空气侧端子形变及集油盒移位进行了过程陈述和问题分析,剖析了事故产生的原因,并为今后的架空线与变压器套管端子的配合给出了一些意见和建议。 Some advises and suggestions have been given to the cooperation of the aerial wire and transformer bushing airterminals by stating and analyzing the problems of the air-terminal deformation and oil-container position deviating of many LV and NV bushings on one domestic 1000 kV Project, and parsing the process and causes of the accident.
作者 孔垚 闻政 赵光平 李文博 Kong Yao;Wen Zheng;Zhao Guangping;Li Wenbo(Shenyang Hexin Bushing Co.,Ltd.,Shenyang Liaoning 110144;Shenyang Electrical Accessory Subsidiary of TBEA Shengyang transformer Group Co.,Ltd.Shenyang Liaoning 110144)
出处 《工程技术研究》 2019年第6期117-119,共3页 Engineering and Technological Research
关键词 百万伏 套管 端子形变 集油盒移位 1000kV bushing air-terminal deformation oil-container position deviating
  • 相关文献

同被引文献14

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部