摘要
本文对国内某百万伏项目主变低压侧、中性点套管的多起空气侧端子形变及集油盒移位进行了过程陈述和问题分析,剖析了事故产生的原因,并为今后的架空线与变压器套管端子的配合给出了一些意见和建议。
Some advises and suggestions have been given to the cooperation of the aerial wire and transformer bushing airterminals by stating and analyzing the problems of the air-terminal deformation and oil-container position deviating of many LV and NV bushings on one domestic 1000 kV Project, and parsing the process and causes of the accident.
作者
孔垚
闻政
赵光平
李文博
Kong Yao;Wen Zheng;Zhao Guangping;Li Wenbo(Shenyang Hexin Bushing Co.,Ltd.,Shenyang Liaoning 110144;Shenyang Electrical Accessory Subsidiary of TBEA Shengyang transformer Group Co.,Ltd.Shenyang Liaoning 110144)
出处
《工程技术研究》
2019年第6期117-119,共3页
Engineering and Technological Research
关键词
百万伏
套管
端子形变
集油盒移位
1000kV
bushing
air-terminal deformation
oil-container position deviating